Sunday, August 22, 2010

Almost done!

Victor and I have spend the past few days removing built in bed frames from one of our bedrooms in our new house.  Below are some pictures.

We spent our Friday night at the house and this was what it looked like when we left for the night.  (Canon S90, 08/20/2010).
Victor spent a few hours at the house on Saturday.  He was able to remove most of the stuff on the right side himself.  Since I was not there, that's why the left side is still all there.  He spent most of today cleaning up the right side, while I was starting on the left.  (Canon S90, 08/22/2010)
And this is how the room looked when we left this afternoon.  We made pretty good progress.  The time difference between this picture and the one above is about 2 hours or so.  There are still some beams attached to the hardwood floors.  The screws are pretty tight and are hard to take out, even with the power tool.  We were pretty tired and decided to call it a day.  The middle section will have to be saved for another day.  (Canon S90, 08/22/2010)

1 comment:

  1. where is you guys new nest?
    we should get together when work is done @ your beautiful place

    ReplyDelete